CZECH DEUTSCH ENGLISH POLAND
[Homepage] [Průběžné výsledky] [Calendar of Actions] [Další informace] [Contact ] [Login]

Návrat na hlavní stranu

Railway bridge [ Bridge or viaduct ]

One of the longest European iron concrete railway bridges (with a span of 120 m), total length 300 m, width 9 m and height 30 m between the hills Pasník and Mírová was finished in 1953 on the railway line Brno - Havlíčkův Brod.
The picture of the bridge is also on a Czech post stamp.

LOCATION


LAST MODIFY: uživatel č. 685 org. 56, 21.03.2005 v 08:11 hodin

Copyright 2000-2025 © speedway.cz